Table 7 Steel grouting pipe pull-out test loading and unloading grade table.

From: Study on the disaster mechanism and prevention technology of embankment slip-collapse after extreme rainfall in the loess area

Loading and unloading cycles

Load increment: percentage of ultimate tensile strength

Cycle 1

10

      

30

     

10

Cycle 2

10

30

     

40

    

30

10

Cycle 3

10

30

40

    

50

   

40

30

10

Cycle 4

10

30

40

50

   

60

  

50

40

30

10

Cycle 5

10

30

40

50

60

  

70

 

60

50

40

30

10

Cycle 6

10

30

40

50

60

70

 

80

70

60

50

40

30

10

Cycle 7

10

30

40

50

60

70

80

90

      

Observation time(min)

5

5

5

5

5

5

5

15

5

5

5

5

5

5