Fig. 3
From: Comparative analysis of earned value management techniques in construction projects

EAC accuracy of the studied EV methods with 95% confidence level.
From: Comparative analysis of earned value management techniques in construction projects

EAC accuracy of the studied EV methods with 95% confidence level.