Table 3 Case 1 pipe unbrella.

From: Research on the construction method of high-speed railway tunnel in sandy loess and fine sand composite strata

Group name prefix

S1

S2

S3

S4

S5

S6

S7

S8

S9

S10

Advanced support

15 m

      

30 m

  

Upper bench construction

 

2 m

4 m

6 m

8 m

10 m

12 m

14 m

16 m

18 m

Middle bench construction

    

2 m

4 m

6 m

8 m

10 m

12 m

Lower bench construction

       

2 m

4 m

6 m