Table 3 Case 1 pipe unbrella.
Group name prefix | S1 | S2 | S3 | S4 | S5 | S6 | S7 | S8 | S9 | S10 |
|---|---|---|---|---|---|---|---|---|---|---|
Advanced support | 15 m | 30 m | ||||||||
Upper bench construction | 2 m | 4 m | 6 m | 8 m | 10 m | 12 m | 14 m | 16 m | 18 m | |
Middle bench construction | 2 m | 4 m | 6 m | 8 m | 10 m | 12 m | ||||
Lower bench construction | 2 m | 4 m | 6 m |