Table 4 Case 2 horizontal jet grout pile 15 m.

From: Research on the construction method of high-speed railway tunnel in sandy loess and fine sand composite strata

Group Name Prefix

S1

S2

S3

S4

S5

S6

S7

S8

S9

S10

S11

S12

S13

S14

S15

S16

Advanced support

15 m

      

30 m

        

Upper bench construction

 

2 m

4 m

6 m

8 m

10 m

12 m

14 m

16 m

18 m

20 m

22 m

24 m

26 m

28 m

30 m

Middle Bench construction

       

2 m

4 m

6 m

8 m

10 m

12 m

14 m

16 m

18 m

Lower bench construction

             

2 m

4 m

6 m