Table 5 Case 3 horizontal jet grout pile 9 m.

From: Research on the construction method of high-speed railway tunnel in sandy loess and fine sand composite strata

Group name prefix

S1

S2

S3

S4

S5

S6

S7

S8

S9

S10

Advanced support

9 m

  

18 m

  

27 m

  

36 m

Upper bench construction

 

2 m

4 m

6 m

8 m

10 m

12 m

14 m

16 m

18 m

Middle bench construction

    

2 m

4 m

6 m

8 m

10 m

12 m

Lower bench construction

       

2 m

4 m

6 m