Table 5 Comparison table for Case III.

From: A Golden Jackal based optimal operation and optimization of a virtual power plant involving renewable resources

Objectives

Cost ($)

Emission (Kg)

Parameters

Proposed GJO

BWA

SSA

Proposed GJO

BWA

SSA

Min

3085.64

3175.68

3350.39

48,635.13

49,211.49

49,685.64

Max

5712.71

5748.42

5835.6

1,07,668.24

1,08,278.73

1,08,625.16