Table 13 Component cost of renewable energy system optimization solution with battery storage energy.
From: Economic and environmental assessment of different energy storage methods for hybrid energy systems
Component | Capital ($) | Replacement ($) | O&M ($) | Salvage ($) | Total ($) |
|---|---|---|---|---|---|
Battery | 22,000.00 | 38,127.58 | 4,338.07 | 1,639.61 | 62,826.03 |
WT PV | 57,960.00 25,072.39 | 36,276.30 20,051.45 | 13,014.20 8,366.59 | 25,728.93 14,221.47 | 81,521.57 39,268.96 |
Converter | 6,931.5.0 | 5,861.92 | 2,733.57 | 1,747.40 | 13,779.58 |
System | 111,963.89 | 100,317.24 | 28,452.43 | 43,337.42 | 197,396.15 |