Table 12 The payload parameters of dive 17.
Payload term | Weights (kg) | Displaced volume (m3) |
|---|---|---|
Lead blocks for equalization | 16 | 0 |
Consumables in the manned tank | 54.55 | 0 |
Pilots | 252 | 0 |
Ballast water | 0 | 0 |
Tools | 125 | 0.0114 |
Payload term | Weights (kg) | Displaced volume (m3) |
|---|---|---|
Lead blocks for equalization | 16 | 0 |
Consumables in the manned tank | 54.55 | 0 |
Pilots | 252 | 0 |
Ballast water | 0 | 0 |
Tools | 125 | 0.0114 |