Table 11 Optimization result for various energy systems of IEEE 69-bus in terms of APL and NPC.
Parameter | Case-01 | Case-02 | Case-03 |
|---|---|---|---|
Cost (million $) | 44.89 | 50 | 44.21 |
APL(KW) | 14.38 | 4.18 | 3.94 |
Generator/MMR(MW), Loc | 2.2 (61) | 1.868 (61) | 1.83 (61) |
Generator (MVAR) | 1. 36 | 1.158 | 1.135 |
Solar PV(MW), Loc | 0.00 | 0.780 (4) | 0.780 (48) |
Wind (MW), Loc | 0.00 | 0.564 (17) | 0. 576 (17) |
Wind (MVAR) | 0.00 | 0.349 | 0.357 |
VMIN (p.u) | 0.975 | 0.994 | 0.995 |
CO2 emission (ton/year) | 13,490 | 11,454 | 73.02 |
CO2 Penalty ($) | 41,848 | 35,532 | 226.50 |