Table 2 Construction parameters of 21,201 air return roadway roof pre-splitting blasting.

From: Investigation of the mechanism and application of pressure relief roadway in preventing rock burst

Position

Hole depth, m

Hole inclination,°

Charge length, m

Sealing length, m

Charge quantity, kg

Spacing, m

Stope

46

30

30

≥ 16

90

20

Wall

45

45

30

≥ 15

90

20