Fig. 6

The behavioral battery test commenced at postnatal day (PND) 60, beginning with the MBT. On PND 61, offspring were sequentially tested in the OF, EPM, and HB tests. Following a four-day washout period, the TCT was conducted on PND 66. After an additional seven-day washout, the FST was performed on PND 74.