Table 3 Difference in modelled Building heights relative to Pleiades-derived heights.

From: Narrowing the gap for city building height predictions

City

Model

Median

Mean

Standard deviation

MAE

NMAD

Nairobi

Open Buildings Temporal

− 2.18

− 2.10

2.95

1.91

2.02

Pix2Pix (E)

− 0.77

− 1.24

5.41

3.25

2.86

He et al.38

− 0.49

0.07

5.92

3.77

3.64

Quito

Open Buildings Temporal

− 2.09

− 2.26

2.81

1.92

2.09

Pix2Pix (E)

0.59

0.66

3.79

2.53

2.61

He et al.38

− 1.78

− 2.28

5.21

3.58

3.75

Kathmandu

Open Buildings Temporal

− 0.73

− 0.54

2.66

2.03

2.40

Pix2Pix (E)

− 1.23

− 1.26

4.22

3.09

3.47

He et al.38

1.07

0.64

4.54

3.38

3.88