Table 5 Comparison results on a 3-unit generator with total load demand of 850 MW.

From: Memetic Salp Swarm Algorithm for economic load dispatch problems

Algorithm

Best cost

Mean cost

MSSA

8,234.07

8,234.07

SSA

8,234.07

8,234.07

\(\beta\)HC

8,234.07

8,234.07

\(\beta\)HC-GWO

8,234.07

8,234.07

CASO

8,234.07

8,234.07

ChPSO

8,234.07

NA

FCASO-SQP

8,234.07

8,234.07

GA-PS-SQP

8,234.10

8,234.10

HCPSO-SQP

8,234.07

8,234.07

MDE

8,234.07

NA

NDS

8,234.07

8,234.07

NSS

8,234.08

8,234.08

NUHS

8,234.07

8,234.07

QIPSO

8,234.07

8,234.10

SDE

8,234.07

NA

THS

8,234.07

8,234.07