Table 9 Comparison results on a 13-unit generator with total load demand of 1800 MW.
From: Memetic Salp Swarm Algorithm for economic load dispatch problems
Algorithm | Best cost | Mean cost |
|---|---|---|
MSSA | 17,960.40 | 17,965.60 |
SSA | 17,969.66 | 18,064.31 |
ABOMDE | 17,963.85 | 17,967.36 |
\(\beta\)HC | 17,960.41 | 17,988.60 |
\(\beta\)HC-GWO | 17,960.38 | 17,960.63 |
CASO | 17,965.15 | 18,022.04 |
DHS | 17,960.37 | 17,961.12 |
FCASO-SQP | 17,964.08 | 18,001.96 |
GA-PS-SQP | 17,964.00 | 18,199.00 |
GWO | 17,972.94 | NA |
HHS | 17,963.83 | 17,972.48 |
HMAPSO | 17,969.31 | 17,969.31 |
HQIPSO | 17,966.37 | 18,081.05 |
HS2 | 17,965.62 | 17,986.56 |
IHS | 17,960.37 | 17,965.42 |
MPDE | 17,960.37 | 17,960.37 |
MSL | 18,158.68 | NA |
NDS | 17,976.95 | 17,976.95 |
NSABC | 17,972.96 | 18,022.86 |
NSS | 17,976.95 | 17,976.95 |
NUHS | 17,960.37 | 17,987.10 |
QIPSO | 17,969.01 | 18,075.11 |
RCGA | 17,963.86 | NA |
SDP | 17,963.98 | NA |
SDE | 17,963.83 | 17,963.97 |
THS | 17,960.37 | 17,977.60 |