Table 9 Comparison results on a 13-unit generator with total load demand of 1800 MW.

From: Memetic Salp Swarm Algorithm for economic load dispatch problems

Algorithm

Best cost

Mean cost

MSSA

17,960.40

17,965.60

SSA

17,969.66

18,064.31

ABOMDE

17,963.85

17,967.36

\(\beta\)HC

17,960.41

17,988.60

\(\beta\)HC-GWO

17,960.38

17,960.63

CASO

17,965.15

18,022.04

DHS

17,960.37

17,961.12

FCASO-SQP

17,964.08

18,001.96

GA-PS-SQP

17,964.00

18,199.00

GWO

17,972.94

NA

HHS

17,963.83

17,972.48

HMAPSO

17,969.31

17,969.31

HQIPSO

17,966.37

18,081.05

HS2

17,965.62

17,986.56

IHS

17,960.37

17,965.42

MPDE

17,960.37

17,960.37

MSL

18,158.68

NA

NDS

17,976.95

17,976.95

NSABC

17,972.96

18,022.86

NSS

17,976.95

17,976.95

NUHS

17,960.37

17,987.10

QIPSO

17,969.01

18,075.11

RCGA

17,963.86

NA

SDP

17,963.98

NA

SDE

17,963.83

17,963.97

THS

17,960.37

17,977.60