Table 27 Results of comparing VWD with VWS.

From: An enhanced opposition-based African vulture optimizer for solving engineering design problems and global optimization

Algorithm

No. of turbines

Cost/kW

Power (kW)

Efficiency

EOBAVO

39

0.000807

30,830

84.49%

LSHADE 32

39

0.000807

30,829

84.49%

GWO8

39

0.000827

34,911

84.19%

GA76

46

0.000969

11,935

83.89%

GA77

15

0.000817

30,331

91.59%

SBO79

40

0.000824

30,982

82.89%

RSA78

39

0.000816

30,575

NA

BPSO-TVAC80

38

0.000812

14,277

84.69%