Table 4 Evaluation metrics for various interval estimation methods on clear days.
Confidence level | Method | PICP | PINAW | CWC |
|---|---|---|---|---|
95% | Bootstrap | 0.8750 | 0.1950 | 8.4852 |
KDE | 0.9821 | 0.2749 | 0.2749 | |
ABKDE | 0.9821 | 0.2726 | 0.2726 | |
90% | Bootstrap | 0.6964 | 0.1536 | 4045.3821 |
KDE | 0.8750 | 0.1985 | 0.8915 | |
ABKDE | 0.9286 | 0.2097 | 0.2097 |