Table 5 Evaluation metrics for various interval estimation methods on cloudy days.
Confidence level | Method | PICP | PINAW | CWC |
|---|---|---|---|---|
95% | Bootstrap | 0.8929 | 0.2300 | 0.5587 |
KDE | 0.9643 | 0.3285 | 0.3285 | |
ABKDE | 0.9643 | 0.3009 | 0.3009 | |
90% | Bootstrap | 0.8214 | 0.2192 | 11.3596 |
KDE | 0.8929 | 0.2420 | 0.5880 | |
ABKDE | 0.8929 | 0.2315 | 0.5623 |