Fig. 13

Predicted vs. measured MOR for D0–D6. Solid line = 1:1; dashed = + 2%/ − 4% envelopes. Points cluster near identity (R2 ≈ 0.99); D1–D6 show ≤ 0.17% error, while the control D0 has the largest deviation (− 7.5%).

Predicted vs. measured MOR for D0–D6. Solid line = 1:1; dashed = + 2%/ − 4% envelopes. Points cluster near identity (R2 ≈ 0.99); D1–D6 show ≤ 0.17% error, while the control D0 has the largest deviation (− 7.5%).