Table 2 Mining parameters of the orebody under the condition that permanent facilities are present on both the hanging wall and footwall sides in the case mine.
From: Investigation on the transition depth of open pit to underground mining in Sijiaying iron mine
Exploration line No. | Dip angle of ore body | Hanging wall | Footwall | |||
|---|---|---|---|---|---|---|
γ1/(°) | γ2/(°) | L/m | α/(°) | m | β/(°) | |
N12 | 48 | 49 | 766 | 43 | 447 | 36 |
N14 | 43 | 55 | 874 | 41 | 388 | 38 |
N16 | 43 | 39 | 1022 | 41 | 220 | 34 |
N18 | 42 | 43 | 1123 | 42 | 356 | 34 |
N20 | 47 | 45 | 1043 | 43 | 363 | 34 |
N22 | 40 | 44 | 1094 | 41 | 243 | 35 |
N24 | 33 | 38 | 1203 | 43 | 108 | 35 |
N26 | 27 | 43 | 1384 | 43 | 126 | 36 |
N28 | 37 | 47 | 1000 | 43 | 204 | 36 |