Table 4 Key parameters and their values determining the maximum open pit mining depth of the Sijiaying iron mine.

From: Investigation on the transition depth of open pit to underground mining in Sijiaying iron mine

Parameter

Value

Unit

Ore density

3.16

t∙m−3

Average dip angle of the hanging wall

40.00

(°)

Average dip angle of the footwall

44.78

(°)

Average orebody thickness

74.00

m

Maximum allowable slope angle on the hanging wall

43.00

(°)

Maximum allowable slope angle on the footwall

38.00

(°)

Open pit mining cost

16.80

¥∙t−1

Open pit stripping cost

30.20

¥∙t−1

Underground mining cost

108.96

¥∙t−1

Final economic depth

407.00

m

Final technical depth

388.00

m