Fig. 5

Left bank reconstruction of the Dingnei Reach (a) Disaster damage (2001, Sep.); (b) Design illustration of riverbank; (c) Early stage of the project (2007, Jun.); (d) Present situation (2023, Aug.).

Left bank reconstruction of the Dingnei Reach (a) Disaster damage (2001, Sep.); (b) Design illustration of riverbank; (c) Early stage of the project (2007, Jun.); (d) Present situation (2023, Aug.).