Fig. 7
From: Maximizing waste heat recovery from a building-integrated edge data center

Workload distributions and utilization rates: (a) Test 1 (FS = 30% and VOR = 55%), (b) Test 2 (FS = 30% and VOR = 55%), (c) Test 3 (FS = 30% and VOR = 50%) and (d) Test 4 (FS = 30% and VOR = 55%).