Table 3 Validation of detected anomalies in MisrSat-2 solar panel currents (May 9–15, 2024).
Validation method | Solar Panel 1 | Solar Panel 2 | Notes |
|---|---|---|---|
CUSUM detections (raw) | 29 | 30 | All candidate change points identified (5-min cadence, illumination only) |
Welch’s t-test (p < 0.05) | 14 | 16 | Initial statistical significance check |
Bootstrapping (10,000 resamples) | 12 | 15 | Robust against small sample size |
BH-FDR (q = 0.05) | 13 | 17 | Final robust anomalies retained after multiple-testing correction |