Table 5 Impact of Usability and Customer Demand on MOEE.

From: Uncovering the Influence of Operational Factors on Manufacturing Efficiency with Real Time Data

Date

Shift (Hr)

shift (Min)

Total Output

Waste

Total Goods

Ideal cycle time (Min)

Customer demand

*Running Time* (Min)

A (%)

P (%)

Q (%)

U (%)

C (%)

TOEE (%)

MOEE (%)

TEEP (%)

OEE (%)

OFE (%)

Machine parameters

Input parameters

Output parameters

5-Sep 2023

10.1

610.2

10

2

8

23.7

25

488.2

80

49

80

80

97

31.10

24.1

25

38.8

31.36