Table 7 Equipment Efficiency and Loss Analysis Report.

From: Uncovering the Influence of Operational Factors on Manufacturing Efficiency with Real Time Data

Date (DD-M-23)

TOEE (%)

MOEE (%)

Loss Detected

Parameter Responsible for Loss

Corrective Actions

25-Aug-23

45.31

22.91

Equipment Failure, Setup & Changeover Losses

Availability (Machine Breakdown)

Implement regular preventive maintenance and focus on reducing setup/changeover time.

26-Aug-23

63.12

37.66

Minor Stoppages, Setup & Changeover Losses

Performance (Minor Stoppage, Reduced Speed)

Reduce minor stoppages through better training or process adjustments, and optimize setup/changeover frequency.

27-Aug-23

73.11

54.65

Setup/Changeover Losses, Defects

Usability (Frequency of Setup Process), Quality (Defects)

Focus on reducing frequency of setup/changeovers and improving changeover process efficiency. Improve quality control to reduce defects.

28-Aug-23

31.26

11.07

Poor Equipment Availability, Excessive Setup Time

Availability (Equipment Failure), Usability (Excessive Setup Time)

Perform root cause analysis on machine failures, streamline setup processes, and minimize changeover time.