Table 1 Distribution of MDG projects across the study area.
LGA | S/N | VILLAGE | MDG WATER PROJECT | TYPE | PRESENT CONDITION |
|---|---|---|---|---|---|
Ayedaade | 1 | Matako | Absent | NA | NA |
2 | Orile Owu | Present | Powered borehole | F | |
3 | Temidire | Absent | NA | NA | |
Ayedire | 4 | Ileran | Absent | NA | NA |
5 | Asipa | Absent | NA | NA | |
6 | Bole | Absent | NA | NA | |
7 | Olupona | Present | Motorized borehole | NF | |
Ejigbo | 8 | Aye | Absent | NA | NA |
9 | Aba Ejigbo | Absent | NA | NA | |
10 | Owu-Ile | Present | Motorized borehole | F | |
11 | Masifa | Present | Motorized borehole | F | |
Egbedore | 12 | Ara | Absent | NA | NA |
13 | Alaasan | Present | Motorized borehole | NF | |
14 | Oojo | Present | Motorized borehole | F | |
Ola-Oluwa | 15 | Ikonifin | Present | Motorized borehole | NF |
16 | Olota | Absent | NA | NA | |
17 | Isero | Absent | NA | NA | |
Ede South | 18 | Oke Iresi | Absent | NA | NA |
19 | Oloki | Present | Motorized borehole | F | |
20 | Idi Aawe | Present | Motorized borehole | NF | |
Ede North | 21 | Oke Gada | Absent | NA | NA |
22 | Olaiya | Absent | NA | NA | |
23 | Railway junction | Absent | NA | NA | |
Irewole | 24 | Olupele | Absent | NA | NA |
25 | Oosa | Absent | NA | NA | |
26 | Agbora | Absent | NA | NA | |
Isokan | 27 | Osa | Present | Motorized borehole | NF |
28 | Papaanla | Absent | NA | NA | |
29 | Aba Alara | Present | Motorized borehole | NF | |
Iwo | 30 | Ayede | Absent | NA | NA |
31 | Isale Oba | Absent | NA | NA |