Table 9 Comparison of the controller gain values for non-minimum phase hydropower plant.
| Â | Kp | Ki | Kd | N |
|---|---|---|---|---|
ZN Method | 0.90984 | 0.1483 | 1.2928 | - |
GA – ISE | 7.2140 | 0.9452 | 23.9717 | - |
Fractional Order – PID L. Meng [27] | 4.744 | 1, λ = 0.370 | 6.493, µ = 1 | - |
PID L. Meng [27] | 6.697 | 1 | 12.828 | - |
Proposed | 3.88 | 0.38 | 10 | 0.0935 |