Table 5 Calculation results of rock debris bed thickness, drilling cost, and drilling cycle of well 1 and well 2 for four schemes in oilfield A.

From: Research and application of quantitative model for optimal well trajectory selection

Schemes

Well

Raw values

Normalized values

Thickness of rock debris bed (mm)

Drilling cycle (d)

Drilling cost ($)

Thickness of rock debris bed

Drilling cycle

Drilling cost

1

1

25.88

18.5

3,493,876

1.00

0.61

0.89

2

0

23

1,854,686

0.00

0.75

0.47

2

1

0

13

1,854,574

0.00

0.43

0.47

2

20

30.5

3,912,127

0.77

1.00

1.00

3

1

0

14

2,531,512

0.00

0.46

0.65

2

0

24

2,531,522

0.00

0.79

0.65

4

1

0

23

2,545,876

0.00

0.75

0.65

2

0

23

2,445,604

0.00

0.75

0.63