Fig. 18
From: An integrated analysis of naval platform survivability for mission resilience

At 667 s after RPG detonation, the fire is extinguished and the Damage Control Team is tasked with repairing the steering equipment in Compartment 5Q. The dashed line depicts the route of the Damage Control Team.