Table 10 Comparison of the proposed method with the approach of reference13.
Objective value | Objective improvement (%) | System losses (kW) | Total curtailment of P2P (kW) | Voltage magnitude imbalance (\(\rho^{mag}\)) | Run time (s) | Open switches | ||
|---|---|---|---|---|---|---|---|---|
Method of Zhou et al.13 | Before reconfiguration | 1.135 | 3.52 | 34.97 | 792.08 | 3.467 | 10.84 | – |
After reconfiguration | 1.095 | 41.37 | 997.53 | 3.072 | 38.19 | 60–160, 18–135, 23–25, 36–64, 94–54 | ||
Proposed method | Before reconfiguration | 1.277 | 15.58 | 141.10 | 1196.36 | 3.588 | 17.54 | – |
After reconfiguration | 1.078 | 138.34 | 1095.73 | 2.917 | 72.66 | 23–25, 60–160, 151–300, 36–64, 94–54 |