Table 8 Connected switchable lines from optimization results for Cases 2 and 3 of the IEEE 123-bus DN.

From: An MILP approach for optimal operation of unbalanced distribution networks through coordinated network reconfiguration and SOP utilization

Case

Phase

Connected switchable lines

Case 2

Phase a

13–152, 18–135, 23–25, 52–87, 97–197

Phase b

13–152, 23–25, 52–87, 97–197, 151–300

Phase c

13–30, 13–152, 52–87, 97–197, 151–300

Case 3

Phase a

13–152, 23–25, 36–64, 52–87, 151–300

Phase b

13–152, 23–25, 52–87, 97–197, 151–300

Phase c

13–152, 18–135, 23–25, 52–87, 151–300