Table 4 Comparison of key performance metrics across scenarios 1 and 2.
From: Dynamic optimization of shared storage for renewable driven grids with insights from Egypt
Entity | CUR R (MWh) | S1 Util (%) | S2 Util (%) |
|---|---|---|---|
Wind Power Entity 1 (150 MW) | 64.5 | 28.5 | 45.3 |
Wind Power Entity 2 (100 MW) | 98.2 | 34.2 | 39.8 |
PV Entity 3 (150 MW) | 35.2 | 30.1 | 35.4 |
Entire Centralized SES Station | 198.0 | 31.8 | 41.2 |