Table 8 Reconstruction results of the RFRM during the VP2 period.

From: A multi-temporal scale framework for comprehensive quantification and attribution of anthropogenic impacts on runoff

Model

\({Q_{pre}}\)

\({Q_{post}}\)

\(\Delta {Q_{total}}\)

\({Q_{re}}\)

\(\Delta {Q_C}\)

\(\Delta {Q_H}\)

\({\eta _C}(\% )\)

\({\eta _H}(\% )\)

P-E-Month

66.82

85.11

18.29

75.38

8.56

9.73

46.80

53.20

P-T- Month

75.53

9.71

8.58

53.09

46.91

P-E-T-Month

73.32

6.50

11.79

35.54

65.46

P-Month

75.53

9.71

8.58

53.09

46.91

P-E-Two-month

133.63

170.21

36.58

146.03

12.40

24.18

33.90

66.10

P-T-Two-month

149.37

15.74

20.84

43.03

56.97