Table 11 The parameter values for test problems.
Parameter | Description | Numerical value (uniform distribution function) | Unit |
|---|---|---|---|
AGV speeds | Speed of AGVs used for material handling | \(\sim U\left[\text{1,5}\right]\) | meter/minute |
\({\widetilde{Pr}}_{jmsl}\) | Fuzzy triangular processing time | \(\sim\)(\(U\left[\text{1,5}\right],U\left[\text{6,9}\right],U\left[\text{10,15}\right]\)) | minute |
\({D}_{ms{m}{\prime}(s+1)}\) | Travel distance | \(\sim U\left[\text{5,50}\right]\) | meter |
\({Se}_{jims}\) | Sequence-dependent setup time | \(\sim U\left[\text{0.25,5}\right]\) | minute |
\({\widetilde{a}}_{jim}\) | Fuzzy learning coefficient | \(\sim U\left[-5,-1\right]\) | dimensionless |
\({PEC}_{msl}\) | Processing energy consumption cost | \(\sim U\left[\text{10,1000}\right]\) | dollar |
\({SEC}_{ms}\) | Setup energy consumption cost | \(\sim U\left[\text{10,200}\right]\) | dollar |
\({IEC}_{ms}\) | Idle energy consumption cost | \(\sim U\left[\text{10,80}\right]\) | dollar |
\({LEC}_{jsu}\) | Loaded AGV energy consumption cost | \(\sim U\left[\text{10,500}\right]\) | dollar |
\({UEC}_{su}\) | Un-loaded AGV energy consumption cost | \(\sim U\left[\text{10,200}\right]\) | dollar |