Table 4 ANOVA analysis for the montage workflow.
From: Efficient workflow scheduling in fog-cloud collaboration using a hybrid IPSO-GWO algorithm
Task size | Metric | Mean value | F-statistic | P-value | Significant | Best algorithm |
|---|---|---|---|---|---|---|
100 | Makespan | 568.52 | 0.70136 | 0.59512 | No | IPSO-GWO |
100 | Energy consumption | 194.01 | 19.024 | 3.2139eâ09 | Yes | IPSO-GWO |
100 | Cost | 525.08 | 0.89501 | 0.47485 | No | IPSO-GWO |
500 | Makespan | 1545.9 | 1.3126 | 0.27977 | No | IPSO-GWO |
500 | Energy consumption | 1063.5 | 12.591 | 5.9047eâ07 | Yes | IPSO-GWO |
500 | Cost | 1473.9 | 2.4072 | 0.063283 | No | IPSO-GWO |
1000 | Makespan | 1473.9 | 0.92321 | 0.45889 | No | IPSO-GWO |
1000 | Energy consumption | 2322.4 | 26.347 | 2.719eâ11 | Yes | IPSO-GWO |
1000 | Cost | 3206.6 | 0.25994 | 0.90205 | No | IPSO-GWO |