Table 5 Control techniques applied across all case studies.
Trail No. | Run No. | Control Scheme | Optimization Method | Controller | Controller Loop Assignment | |||
|---|---|---|---|---|---|---|---|---|
LFC Loops | AVR Loops | |||||||
\(\:{LFC|}_{Area1}\) | \(\:{LFC|}_{Area2}\) | \(\:{AVR|}_{Area1}\) | \(\:{AVR|}_{Area2}\) | |||||
1 st Trial | 1 st Run | PID | PSO | PID | PID | PID | PID | PID |
2nd Run | GTO | PID | PID | PID | PID | PID | ||
3rd Run | MPA | PID | PID | PID | PID | PID | ||
2nd Trial | 1 st Run | PIDD² | PSO | PIDD² | PIDD² | PIDD² | PIDD² | PIDD² |
2nd Run | GTO | PIDD² | PIDD² | PIDD² | PIDD² | PIDD² | ||
3rd Run | MPA | PIDD² | PIDD² | PIDD² | PIDD² | PIDD² | ||
3rd Trial | 1 st Run | \(\:{F{PIDD}^{2}|}_{LFC\:Loops}\:\) \(\:+\) \(\:\:{{PIDD}^{2}|}_{AVR\:Loops}\:\) | PSO | FPIDD²+PIDD² | FPIDD² | FPIDD² | PIDD² | PIDD² |
2nd Run | GTO | FPIDD²+PIDD² | FPIDD² | FPIDD² | PIDD² | PIDD² | ||
3rd Run | MPA | FPIDD²+PIDD² | FPIDD² | FPIDD² | PIDD² | PIDD² | ||