Table 3 The amount of waste generation in the buildings.

From: Predicting construction waste in Egyptian residential projects: a robust multiple regression model approach

Sample

Waste (ton)

Concrete

Steel

Brick

B1

220

8

70

B2

82

2.1

27

B3

229

4

49

B4

42

0.8

17

B5

90

2.3

31

B6

319

8.1

98.5

B7

146

4.8

55

B8

141

3.8

46.5

B9

230

7.2

72

B10

39

1.1

14.4

B11

180

5.8

66.5

B12

196

7

78

B13

229

7.3

90.5

B14

460

17.1

106

B15

240

6.4

65

B16

251

15

115

B17

238

7.9

65

B18

420

15.7

120

B19

280

9.6

110

B20

40

1.5

26

B21

47

1.7

20

B22

162

4.7

60

B23

186

6

80

B24

137

2.5

40

B25

155

10.5

111.5