Table 7 Statistical results for CASE II to solve the STHS problem with uncertainty of wind and Solar PV.

From: Improved quadratic interpolation optimizer for stochastic short-term hydrothermal scheduling with integration of solar PV and wind power

\({\varvec{A}}{\varvec{l}}{\varvec{g}}{\varvec{o}}{\varvec{r}}{\varvec{t}}{\varvec{i}}{\varvec{h}}{\varvec{m}}{\varvec{s}}\)

Average

Best Solution

Worst

Std

Time (Sec)

P-value

\({\varvec{S}}{\varvec{C}}{\varvec{S}}{\varvec{O}}\)

36,357.58

33,773.44

38,482.09

1168.89

1119.45

5.21E-09

\({\varvec{J}}{\varvec{S}}{\varvec{O}}\)

37,815.67

35,968.87

40,524.02

1240.03

895.08

1.42E-09

\({\varvec{Z}}{\varvec{O}}{\varvec{A}}\)

39,705.33

36,747.44

43,232.61

1517.82

1455.87

1.42E-09

\({\varvec{D}}{\varvec{B}}{\varvec{O}}\)

38,824.37

35,858.29

45,647.53

2313.97

302.29

1.42E-09

\({\varvec{E}}{\varvec{E}}{\varvec{F}}{\varvec{O}}\)

35,141.95

33,777.27

37,595.41

874.32

331.92

4.00E-08

\({\varvec{Q}}{\varvec{I}}{\varvec{O}}\)

33,781.21

32,535.65

35,779.51

763.47

387.88

0.004614

\({\varvec{I}}{\varvec{Q}}{\varvec{I}}{\varvec{O}}\)

33,083.00

31,904.15

34,768.04

875.27

3219.64

5.21E-09