Table 12 Comparison of scheduling results for instance from testing workshop.

From: An enhanced walrus optimization algorithm for flexible job shop scheduling with parallel batch processing operation

GA

DE

PSO

GWO

B(Cmax)

Av

Sd

B(Cmax)

Av

Sd

B(Cmax)

Av

Sd

B(Cmax)

Av

Sd

135

144.7

5.59

129

129.5

0.81

128

130.6

4.13

128

129.2

0.75

HHO

ARO

WO

MVO

B(Cmax)

Av

Sd

B(Cmax)

Av

Sd

B(Cmax)

Av

Sd

B(Cmax)

Av

Sd

129

133.0

5.50

128

128.8

0.60

129

131.2

2.79

129

132.3

2.65

OMA

TLBO

PRO

eWaOA

B(Cmax)

Av

Sd

B(Cmax)

Av

Sd

B(Cmax)

Av

Sd

B(Cmax)

Av

Sd

129

128.9

0.30

128

128.7

0.46

130

137.0

5.23

128

128.1

0.30

  1. Significant values are in bold.