Table 3 Key parameters for LCOE Estimation in the present study.
Parameter | Value | Unit |
|---|---|---|
Interest rate (\(\:i\)) | 8 | % |
System lifetime (\(\:n\)) | 20 | year |
Capital recovery factor (\(\:CRF\)) | 10.19 | % |
Investments cost (\(\:{Z}_{investment}\)) | DAPTC cost + copper surfaces cost + laser processing cost | $ |
DAPTC cost (storage tank, reflector, glass absorber tube, and glass cover) | 192 | $ |
Without pattern configuration cost | 7.5 | $ |
Patterned configuration cost | 22.5 | $ |
Operation and maintenance Cost (\(\:{Z}_{O\&M}\)) | 0.025×\(\:{Z}_{investment}\) | $ |
Annual operational hours (\(\:{t}_{annual}\)) | 2555 | h |