Table 8 Evaluation indicators of the optimal operational paths for farmland 2 searched and planned the ACO and IACO.
Search and planning algorithm | Total path length/m | Empty load travel distance/m | Volume of earthwork moved/m3 |
|---|---|---|---|
ACO | 114.37 | 69.27 | 3.15 |
IACO | 155.01 | 67.07 | 6.2 |