Table 2 Basic parameters of each extraction point.

From: Optimization of ore production scheduling strategy using NSGA-II-GRA in open-pit mining

Ore output point

Mining cycle

CaO grade fluctuation interval (% mass fraction)

MgO Average grade (% mass fraction)

Maximum ore output capacity in the cycle (t)

Unit extraction cost (CNY/t)

I

90 d

[0.5189, 0.5298]

2.79

280,000

[10.05, 10.2]

II

90 d

[0.5089, 0.5269]

2.35

350,000

[10.15, 10.25]

III

90 d

[0.4913, 0.5230]

1.99

486,750

[10.25, 10.4]