Table 6 Comparative analysis of optimization results.

From: Optimization of ore production scheduling strategy using NSGA-II-GRA in open-pit mining

Price fluctuation range (%)

Ore output at extraction point (t)

Quarterly ore output (t)

Average calcium oxide grade (%)

Average magnesium oxide grade (%)

Ore market value (ten thousand CNY)

Unit extraction cost (CNY/t)

Production target achievement rate (%)

Quarterly total cash flow

I

II

III

Original plan (without price fluctuation)

97,000

350,000

486,000

933,000

\(\ge 48\)

\(\ge 2.5\)

9105

10.28

96

8147

GA

84555

392332

491994

968900

51.29

2.30

9454

10.27

97.2

8459

NSGA-II-GRA

Solution 1 [−10, 0)

132,296

444,519

512,139

1,088,954

51.36

2.28

9673

10.25

97.6

8557

NSGA-II-GRA

Solution 2 (0, 10]

193,987

443,428

486,861

1,124,276

51.44

2.26

11,974

10.24

97.2

10823

Origin Error (%)

Solution 1

36.39

27.01

5.38

16.72

7.00

8.80

6.24

0.29

1.67

5.03

Origin Error (%)

Solution 2

99.99

26.69

0.18

20.50

7.17

9.60

31.51

0.39

1.25

32.8