Table 5 Statistical parameters derived by comparison of DSSAT vs. MODIS simulation.
Statistical analysis | Shahbaz farm biomass 2012-13 | Shahbaz farm biomass 2013-14 | Rattaber farm biomass 2012-13 | Rattaber farm biomass 2013-14 |
|---|---|---|---|---|
R2 | 0.99 | 0.87 | 0.99 | 0.94 |
MAE | 3664 | 3142 | 3019 | 3763 |
RMSE | 4072 | 3888 | 3384 | 4281 |
nRMSE | 2.3 | 0.73 | 1.62 | 1.76 |
CRM | 0.69 | 0.6 | 0.6 | 0.61 |
D | 0.4 | 0.46 | 0.55 | 0.94 |