Fig. 11

Tunnel segment structure deformation nephogram (deformation scaling factor: 100) [(A) Deformation contour map of the tunnel segmental structure before foundation pit excavation; (B) Deformation contour map of the tunnel segmental structure after completion of foundation pit excavation (The arrows are the direction of displacement, with red representing large displacements and blue representing small displacements.)].