Table 3 Parameters used to estimate the residual soil amount during washing.
Parameter | Value |
|---|---|
Initial soil load | 5 g per sweet potato |
Water flow rate | 3 L/min |
Washing duration | 10 min |
Scrubbing method | Gentle manual scrubbing |
Sweet potato surface area | ~ 150 cm² |