Table 3 Comparison between UPV–UCS and UPV–ITS correlations from the present study and those reported in the literature.

From: Non-destructive assessment of lime and nano-alumina oxide stabilized clay for new material development

No

Soil type

Stabilizer / Additive

Correlation (UCS vs UPV)

R2

Reference

1

CH clay

Lime + Nano-Al₂O₃

UCS = 423.03e0.0025UPV

0.8408

Present work

ITS = 77.597e0.0016UPV

0.799

2

Sand

Portland cement + Nanosilica + PVA fiber

Fiber content = 0%

UCS = 0.011 e1·415

0.919

Soleimani Kutanaei & Janalizadeh Choobbasti27

Fiber content = 0.3%

UCS = 0.003 e1·⁹2⁹ⱽ

0.951

Fiber content = 0.6%

UCS = 0.024 e1·35

0.936

Fiber content = 1%

UCS = 0.011 e1·⁸2⁶ⱽ

0.962

3

Clayey soil

Nano-CaCO₃ + Carpet Waste Fibers

Fiber content = 0%

UCS = 67.62 e2·144

0.83

21,22

Fiber content = 0.2%

UCS = 84.45 e⁰·⁹4⁷ⱽ

0.94

Fiber content = 0.4%

UCS = 58.43 e2·51⁰ⱽ

0.95

Fiber content = 0.6%

UCS = 69.56 e2·3⁷⁸ⱽ

0.9

4

Expansive clay (CH)

Portland cement + Nano-Al₂O₃

UCS = 45.664 e2·45UPV

0.729

Azizi et al.51

ITS = 5.5134 e2·54UPV

0.693

5

CH clay

Cement kiln dust (industrial waste) + Nano-SiO₂ + Polypropylene fibers

Unreinforced samples

UCS = 0.0377 e0.00387 V

0.8776

Pashabavandpouri et al.52

Reinforced samples

UCS = 0.0505 e0.00355 V

0.9042

6

Collapsible soil

Nano-Al₂O₃

UCS = 0.1198 e1·⁰11UPV

0.9286

Pirmousaei et al.53

ITS = 0.0173 e⁰·⁹45UPV

0.8732

7

Clay

Portland cement + Nanosilica

UPV = 3 × 10⁻⁷ × UCS2.9848

0.8772

Aksu & Eskisar54

Sand

UPV = 2 × 10⁻⁷ × UCS3.0297

0.9879

Clayey Sand

UPV = 2 × 10⁻⁸ × UCS3.3251

0.946

8

clayey sand

Portland cement + Nano-ZnO

Curing Time = 7 days

UCS = 3.5985 UPV − 4.6693

0.951

Babaei et al.2,3

Curing Time = 28 days

UCS = 2.3736 UPV − 2.8767

0.9211

Curing Time = 90 days

UCS = 1.8468 UPV − 2.4359

0.8762

9

CL clay

Natural zeolite + Nano-magnetite (Fe₃O₄)

Standard Curing Condition

UCS = 71.803e0.0012UPV

0.891

Eshghi et al.55

Accelerated Curing Condition

UCS = 63.56e0.0015UPV

0.9503