Fig. 7

Indirect tensile strength (ITS) of lime-stabilized CH clay at different lime contents and curing times (7, 14, 28, and 90 days).

Indirect tensile strength (ITS) of lime-stabilized CH clay at different lime contents and curing times (7, 14, 28, and 90 days).