Table 14 Load Curtailment Under Critical Contingencies.
Contingency | Load Shed Base (MW) | Load Shed Optimized (MW) | Reduction (MW) | Reduction (%) | Average Duration (hours) | EENS Base (MWh/year) | EENS Optimized (MWh/year) |
|---|---|---|---|---|---|---|---|
C2 | 2.847 | 0.623 | 2.224 | 78.11 | 4.0 | 18.23 | 3.99 |
C10 | 1.965 | 0.487 | 1.478 | 75.22 | 4.0 | 12.58 | 3.12 |
C18 | 1.523 | 0.398 | 1.125 | 73.87 | 4.0 | 9.75 | 2.55 |
C22 | 1.287 | 0.312 | 0.975 | 75.76 | 4.0 | 8.24 | 2.00 |
C31 | 3.715 | 1.245 | 2.470 | 66.49 | 8.0 | 237.76 | 79.68 |
C32 | 2.134 | 0.589 | 1.545 | 72.40 | 8.0 | 136.58 | 37.70 |
C33 | 1.678 | 0.456 | 1.222 | 72.83 | 8.0 | 107.39 | 29.18 |
Other | - | - | - | - | 4.0 | 120.77 | 34.48 |
Total | - | - | - | - | - | 651.30 | 192.70 |