Table 1 Peak position (P. Pos.) and corresponding peak size (P. Size) of the second largest connected component (SLCC)
Method | Grid | Crime | Collaboration | PH | ||||
|---|---|---|---|---|---|---|---|---|
P. Pos. | P. Size | P. Pos. | P. Size | P. Pos. | P. Size | P. Pos. | P. Size | |
NE_small | 415 | 291 | 27 | 92 | 760 | 153 | 652 | 87 |
NE_large | 1232 | 562 | 37 | 78 | 1215 | 137 | 786 | 71 |
NE_mid | 1239 | 562 | 38 | 78 | 1093 | 34 | 248 | 20 |
NE_mid + R | 242 | 661 | 14 | 186 | 728 | 163 | 512 | 177 |
CNE | 424 | 404 | 12 | 159 | 739 | 195 | 508 | 78 |
CNE + R | 199 | 575 | 12 | 159 | 369 | 228 | 450 | 156 |
VE | 123 | 486 | 6 | 236 | 371 | 370 | 450 | 82 |